
Service 01 · Pre Handover Property Inspection
Before You AcceptThe Keys.
Ensure your new property is delivered defect free before you accept the keys. An independent pre-handover inspection for new apartments, townhouses and villas across Dubai and the UAE.
What it is
New does not always mean defect free.
A Pre Handover Property Inspection is conducted before the buyer officially takes possession of a new property from the developer. Even newly constructed homes can contain defects, incomplete work or quality issues that are easy to miss during a standard walkthrough.
Our inspectors assess the property's structural elements, finishes, mechanical systems and installation quality, so that problems are identified while the developer is still responsible for putting them right.
- 01
Defects
- 02
Incomplete work
- 03
Quality issues
- 04
Installation problems
- 05
Finishing issues
Who, when and common issues
Buyers and investors taking possession of a newly completed apartment, townhouse or villa from a developer in Dubai.
As soon as the developer confirms your handover date, so there's time to raise findings before you sign the handover documents and accept the keys.
- Paint and finishing defects
- Tile and flooring variances
- Plumbing and electrical faults
- Incomplete installations
- AC performance issues
What we assess, room by room.
Every space is examined using industry-standard tools and techniques, from the structure you can't easily see to the fittings you'll use every day.
- Structural elements
- Finishes
- Mechanical systems
- Installation quality
- Walls
- Ceilings
- Flooring
- Doors
- Windows
- Plumbing systems
- Electrical outlets
- Lighting fixtures
- Air-conditioning systems
- Kitchens
- Bathrooms
- Built-in fittings
Documented so the developer can act on it.
All findings are documented with photographs, descriptions and clear location references. The report helps the developer understand the defects and complete the necessary rectifications before handover.
- A
High-Resolution Photos
Every finding is photographed so it can be seen, not just described.
- B
Description of Each Issue
A clear explanation of what the defect is and why it matters.
- C
Location Tagging
Room and surface references, so the developer finds it first time.
- D
Severity Assessment
Ratings that separate urgent items from finishing touches.
- Inspection
- Pre Handover
- Property
- Apartment
- Location
- Dubai, UAE
- Client
- [Client name]
-
Severity · MinorBTH-01 · Master bathroom · Vanity
Sealant incomplete at basin-to-worktop joint.
-
Severity · ModerateLVG-04 · Living room · North wall
Paint finish defect and surface cracking above skirting.
-
Severity · HighKIT-02 · Kitchen · Floor
Uneven tile levels and inconsistent grout lines.
From consultation to re-inspection.
-
01
Initial Consultation
We begin by understanding your property type, handover date, and any specific concerns you may have.
-
02
Site Visit & Inspection
Our qualified inspectors conduct a thorough room-by-room examination of the property using industry-standard tools and techniques.
-
03
Detailed Comprehensive Snagging Report
We provide a comprehensive and easy-to-understand snagging report.
- High-resolution photos
- Description of each issue
- Location tagging
- Severity assessment
-
04
Re-Inspection
After rectification, we offer a re-inspection service to verify that all snags have been properly resolved to your satisfaction.
Booking a handover? Inspect it first.
All inspection services
Services overview- 01Pre Handover Property InspectionBefore you accept the keys.
- 02Move In / Move Out InspectionThe exact condition, on record.
- 03Property Condition Report InspectionDocumentation and peace of mind.
- 0411th Month InspectionBefore the developer's warranty expires.
- 05Secondary Market InspectionKnow the true condition before you buy.
- 06Post Renovation InspectionBefore you sign off on the work.